President Bola Tinubu is set to inaugurate three critical gas infrastructure projects being undertaken by the Nigerian National Petroleum Company Ltd. (NNPCL) and its partners.
Presidential spokesman, Ajuri Ngelale, made this known in a statement on Friday.
He listed the three new gas projects as AHL Gas Processing Plant 2 (GPP – 2), ANOH Gas Processing Plant (AGPC) and ANOH-OB3 CTMS Gas Pipeline Project, saying, when inaugurated, they will increase gas supply to the domestic market by approximately 500mmscf/d, creating a better investment climate and promoting balanced economic growth.
Ngelale said: “The projects support the federal government’s effort to grow value from the nation’s gas assets while eliminating gas flaring.
“The delivery of the projects was accelerated from the inception of the administration in keeping with the overall objective of deepening domestic gas supply as a critical enabler for economic prosperity.”
Ngelale said that the AHL Gas Processing Plant 2 (GPP – 2) was an expansion to the Kwale Gas Processing Plant (GPP – 1), which currently supplies about 130MMscf/d of gas to the domestic market.
According to him, the processing plant was designed to process 200MMscf/d of rich gas and deliver lean gas through the OB3 Gas Pipeline.
“This additional gas supply will support further rapid industrialisation of Nigeria. The plant will also produce about 160,000 MTPA of Propane and 100,000 MTPA of Butane, which will reduce the dependency on LPG imports.
‘’The AHL Gas Plant is being developed by AHL Limited, an incorporated Joint Venture owned by NNPC Limited and SEEPCO”, he said.
Ngelale said that the second project is the ANOH Gas Processing Plant (AGPC) – 300MMscf/d.
Furthermore, he said that this gas plant was an integrated 300MMscf/d capacity gas processing plant designed to process non-associated gas from the Assa North-Ohaji South field in Imo.
‘’The plant will produce dry gas, condensate, and LPG. The gas from ANOH gas plant will significantly increase domestic gas supply, leading to increased power generation and accelerated industrialisation.
‘’The ANOH Gas Plant is being developed by ANOH Gas Processing Company, an incorporated Joint Venture owned by NNPC Limited and Seplat Energy Plc on a 50-50 basis.’’
On the third project, which is the ANOH-OB3 CTMS Gas Pipeline Project, he said that it involved the engineering, procurement, and construction of 36”x23.3km ANOH-OB3 Project.
He further added: ‘’The Transmission Gas Pipeline will evacuate dry gas from the Assa North-Ohaji South (ANOH) primary treatment facility (PTF) to OB3 Custody Transfer Metering Station (CTMS) for delivery into the OB3 pipeline system.
‘’About 600MMscf/d is estimated to be available from two separate 2 x 300MMscf/d capacity gas processing production trains from AGIP & SPDC JV.”